General Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this energy unit is built for your operation of two independent circuits. Which are respectively for the key and subordinate platforms with the double scissors lift. Two cut-off valves are employed for reducing the machine manually in situation of power reduction. If a lot more independent circuits are necessary for the application please get in touch with us for availability.
Remark: 1. Please consult our revenue engineer for your unique pump displacement, motor power or tank capacity.
two. CSA or UL certified motors are available upon request.
Exclusive Notes
1. The AC motor is of S3 duty cycle, which could only do the job intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all of the hydraulic parts concerned just before installation of the energy unit.
three. Viscosity in the oil shoud be 15~46 cst,as well as the oil ought to be clean and totally free of impurities,N46 hydraulic oil is encouraged.
four. The power unit really should be mounted vertically.
5. Check the oil degree in the tank right after the first operating in the power unit.
six. Oil shifting is required immediately after the original 100 operation hrs,afterwards once each and every 3000 hrs.